今天看了則新聞提到目前富士山登頂的路線狀況
https://www.youtube.com/watch?v=69pKR6imaZ4
官網有英文說明
Temporary Trail Advisory: Yoshida and Subashiri Trails
Currently, rock slides just beneath the summit above the converged
Yoshida-Subashiri Trail (above the original 8th station) have blocked the
path.
While the Yoshida Trail in Yamanashi prefecture is scheduled to open July 1st
and Subashiri Trail in Shizuoka prefecture on July 10th, opening the final
portion of the trail (for both routes) may be delayed depending on the
progress of the recovery operation.
Details and updates will be announced on this website as needed.
今年有計畫要去的山友再注意一下,落石的清理狀況